When PO is created manually, the line creation code in PPS201/G = 3-manually created. |
|
When PO is copied from other PO, the line creation code in PPS201/G = 5. copied. |
|
PO subcontracting is created from system planned PO / MO. |
PPS201/F: origin = 21 – from MO:
PPS201/G: line creation code 1 - Automatically |
Where can I see how PO line was created
Modified on: Mon, 6 May, 2024 4:48 AM