When PO is created manually, the line creation code in PPS201/G = 3-manually created.

When PO is copied from other PO, the line creation code in PPS201/G = 5. copied.

PO subcontracting is created from system planned PO / MO.

PPS201/F: origin = 21 – from MO:

 

PPS201/G: line creation code 1 - Automatically